October 2003

Holidays and work commitments have slowed things down a bit this month, with weekends tied up at various events plus some movie editing, but the last two weeks are going to go mad!

With Winter on the way and the fact that I didn't install a membrane under the concrete floor, I grabbed a dry week to seal the entire floor of the Supershed with that special polyurethane paint, which has helped keep the place dry and eliminate dust. In addition, I'm installing a huge heating unit to keep the temperature up, which is vital as I'm scheduled to prep and paint the rear floor pan this month.

Well, the heating unit took ages to install, because my wiring is about as good as my break dancing, but the whole place is toasty now so it looks like November will be back to work as normal.